Yonge and Eglinton parking deck P2- traffic coating and waterproofing system installation

The day we began the removal of the existing coating was quite cold.

After removal we repaired cracking and we installed the membrane which is the first layer of the waterproofing traffic system.

It was still too cold when we installed and instead of it taking 24 hours it took 48 hours before we could install the next layer.

The weather got better the temperature got up to 20° and the job is complete!

  traffic wearcourse installed    Waterproofing membrane installed