Brewery Cooler

The floors in this brewery cooler

Were badly damaged as a result of the removal of 1 ft thick concrete blocks that were part of the floor.

Deep Gouging was filled with heavy duty materials and the floor was overlayed with 1/4″ polyurethane cement. 

    
    
    
    
    
    
   

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>